Lumut 3 combined cycle power station.
Scope
-
600MW Combined Cycle Power Plant based in Segari, Malaysia
-
Part of the OEM Commissioning Team accepting equipment and engineering at manufacturing locations and subsequently managing the installation and commissioning
-
Managed the conversion from open cycle to combined cycle in a 3 day shutdown
-
Interface to Petronas Gas Receiving Stations